
5 kW hybrid, Paloncha
Battery backup for a family with frequent evening power cuts.
Saves about ₹4,500 a month






Tap a service in the orbit to see it.
The subsidy is fixed by system size and paid by direct bank transfer once your DISCOM inspects and commissions the plant. Systems of 3 kW and above get the full ₹78,000.
Apartment societies (RWAs) can claim ₹18,000 per kW for common-area systems up to 500 kW. Scheme period runs until 31 March 2027.
One engineering team designs, installs and services every system, and files the subsidy wherever a scheme applies.

Panels sized to your bill and roof, with the ₹78,000 PM Surya Ghar subsidy and TGSPDCL/TGNPDCL net metering filed by us.
View details
Replace ₹9–12 per unit tariffs with daytime solar. Payback in about 3–4.5 years plus depreciation benefit.
View details
Submersible and surface pumps that irrigate all day on sunlight. No diesel, no waiting for night-time power.
View details
Non-lethal pulsed fencing with siren alarm that keeps wild boar, monkeys and cattle away from crops.
View details
Hot water every morning from 100 to 2,000 litres a day, with tanks built for hard borewell water.
View details
All-in-one LED lights with LiFePO4 batteries and motion sensors. No cable trenching, no power bill.
View detailsPrice, subsidy, monthly saving and payback for your bill, worked out with Telangana sunshine and tariffs.
Indicative only. Based on 4.2 units per kW per day, 3% yearly tariff rise and 0.5% panel ageing. Final price depends on roof height, structure, brand and site survey.
Typical timelines. DISCOM inspection speed varies by area and season.
Roof check, shadow analysis and a look at your last six bills.
Within 3 days of your callPanel layout, structure height and a written, itemised quote.
1–2 days after surveyWe register you on the national portal and apply for feasibility.
1–3 weeksPanels, inverter, earthing and lightning arrester fitted by our own crew.
1–2 days on siteDISCOM inspection, net meter, then subsidy to your bank.
Subsidy about 30 days after commissioningA few installations from around Bhadradri Kothagudem district.

Battery backup for a family with frequent evening power cuts.
Saves about ₹4,500 a month

Replaced a diesel set on a borewell for paddy and vegetables.
Irrigates 4 acres in daylight

Covers classroom fans, lights and computer lab during school hours.
Saves about ₹1 lakh a year

We started in Kothagudem to make well-engineered solar accessible to farmers, families and small businesses across Telangana. We still answer our own phones and send our own crew.
Made-in-India cells required for the subsidy, from Waaree, Adani and Tata.
Separate AC and DC earthing, lightning arrester and surge protection on every job.
Portal, DISCOM, net meter and subsidy claim filed and followed up by our office.
48-hour service response and yearly health checks on request.
Headquartered in Kothagudem, installing across all 33 districts of Telangana.
A practical walkthrough of the PM Surya Ghar application for Telangana: portal registration, DISCOM feasibility, net meter, commissioning and subsidy release.
Compare on-grid and hybrid rooftop solar on price, power-cut backup, savings and subsidy, with a simple rule for choosing in Telangana.
Current turnkey prices for 1, 2, 3, 5 and 10 kW on-grid and hybrid systems in Telangana, the cost after ₹78,000 subsidy, and what changes the price.
A 3 kW on-grid system for a home typically costs ₹1.85–2.1 lakh before subsidy. After the ₹78,000 PM Surya Ghar subsidy, most families pay ₹1.07–1.32 lakh. A 5 kW system costs about ₹2.9–3.3 lakh before subsidy. Roof height, structure and panel brand move the price, so we confirm it after a free site survey.
Under PM Surya Ghar: Muft Bijli Yojana, homes get ₹30,000 for 1 kW, ₹60,000 for 2 kW and ₹78,000 for 3 kW or more. The money is paid by the central government directly to your bank account after the system is commissioned and inspected.
Most RCC (concrete) roofs and sturdy metal sheds work. You need roughly 100 sq ft of shadow-free space per kW. Water tanks, trees and neighbouring buildings can cast shade, which is why we do a shadow analysis during the free survey.
An on-grid system switches off when the grid fails, as a safety rule so linemen are not hurt. If your area has frequent cuts, a hybrid system with batteries keeps essential loads running. Our calculator shows prices for both.
Fitting the panels takes one or two days. The full process, from portal registration to net meter and subsidy, usually takes three to six weeks depending on how quickly your DISCOM (TGSPDCL or TGNPDCL) completes inspection.
Yes. We help you apply for rooftop solar loans from public sector banks such as SBI and Union Bank. Loans for home systems up to 3 kW are available at concessional, repo-linked rates. Use the EMI calculator to compare the instalment with your saving.
Tell us where you are. We call back within one working day to fix a survey time that suits you.
An engineer calls you within one working day.