Short answerCheck the structure (hot-dip galvanised and anchored), earthing (three separate pits), cabling (solar-grade copper in conduit with matched MC4 connectors), protection (SPDs, fuses, lightning arrester), inverter placement (shaded and ventilated), and paperwork (DCR certificate, warranties, invoice) before you sign off.
Structure
- Hot-dip galvanised steel, not painted mild steel
- Anchored with chemical anchors or proper civil footings; no loose ballast
- Tilt about 15–18°, facing south, clear of tank and parapet shadows
- Walkway space to clean every panel safely
Electrical
- Solar DC cable (4 or 6 sq mm copper) in UV-resistant conduit
- MC4 connectors of one brand, crimped with the right tool
- DC distribution box with fuses and surge protection
- AC distribution box with MCB and SPD
- Three earth pits with test readings recorded
- Lightning arrester above the highest panel
Inverter
- Mounted in shade with airflow; never in direct afternoon sun
- Wi-Fi monitoring set up on your phone before the crew leaves
Paperwork and handover
- Invoice naming panel and inverter brand, model and wattage
- DCR certificate and panel serial numbers
- Panel, inverter and workmanship warranty cards
- Earth resistance test values
- Cleaning and safety demo
Frequently asked questions
How many earth pits does a rooftop system need?
Good practice is three: one for the DC side (panels and structure), one for the AC side (inverter output), and one for the lightning arrester.
Should panels face south?
In Telangana, south-facing at a tilt of about 15–18° gives the best yearly output. East-west layouts work when the roof shape demands it, with a small loss.
